Specialists in renewable energy installation, we offer services in Energy, Sustainability and Renewable Technologies in the United Arab Emirates.
We work in the Commercial, Domestic & Industrial sectors to ensure you receive the right solution to lower your energy usage and save money.
Working across a host of sectors, dealing with different scenarios and offering solutions specific to individual needs. Our ability to encompass all aspects of building design means we can adapt to each sector efficiently. Our experienced team are always on hand to offer support and advice whenever it is needed, ensuring our customers gain a cost effective solution and added value.
We are experts in working with a variety of sectors, including; Real Estate, Commercial – Industrial – Manufacturing – Retail – Offices– Educational Facilities – Places of Worship – Hotel and Leisure Facilities – Care & Hospital Facilities – Hotels – Renewable Energy Installations.
ENERGIST SOLUTIONS L.L.C-FZ
Why Energist Solutions expanded in to the UAE
Our experience with alternate energy schemes is extensive, driven by the urgent need to reduce carbon dioxide emissions from traditional sources and to find reliable and sustainable sources of renewable energy.
The UAE Net Zero by 2050 strategic initiative is a national drive to achieve net-zero emissions by 2050, making the Emirates the first Middle East and North Africa (MENA) nation to do so. The initiative aligns with the Paris Agreement, which calls on countries to prepare long-term strategies to reduce greenhouse gas (GHG) emissions and limit the rise in global temperature to 1.5 C compared to pre-industrial levels.
The deployment and use of clean energy solutions is one of the main pillars of the UAE’s model of addressing the challenge of climate change and reducing GHG emissions. The country began financing clean energy projects more than 15 years ago and has invested over 40 billion USD in the sector to date. Current trends predict the production capacity of clean energy, including solar and nuclear, to reach 14 GW by 2030, up from about 100 MW in 2015 and 2.4 GW in 2020.
The UAE has launched several innovative programs to increase energy efficiency. In 2014, Dubai launched the Smart City strategy, focusing on 1,000 government services and development in 6 main areas including transportation, infrastructure, communications, financial services, urban planning and electricity.
The strategy lays out steps toward optimising energy, smarter transport and recreational areas. Demand-side management of electricity will play a role, as will increased public transportation.

Regulations
Green Building codes
In 2010, the UAE Cabinet approved the Green Building and Sustainable Building standards to be applied across the country. Application of these standards started at government buildings early 2011. The project is expected to save AED 10 billion by 2030 and reduce around 30 per cent of carbon emissions.
In 2011, Dubai Government issued a set of ‘Green Building Regulations’ for private sector construction in order to reduce energy and resource consumption as well as improve public health and general welfare. The code is mandatory for all new buildings.

Working Together
How we work with you
Speak with us to get started…
Get in touch and we'll talk about how we can help you.
We'll make sure we find the right cost-effective, flexible solution to suit your needs after we survey your site.
We'll project manage your entire installation for you once you're happy to go ahead.
Save money on your electricity supply by reducing reliance on the grid.
Electricity can be stored in low demand periods and then used in high cost peaks.
Water conservation solutions and technology.

Net Zero Solutions
“The UAE Net Zero by 2050 strategic initiative is a national drive to achieve net-zero emissions by 2050…”

Frequently Asked Questions
A photovoltaic (PV) system uses PV cells to convert sunlight into electricity. PV cells are made of semiconductors and are used to assemble PV modules, PV systems also include inverters, to regulate and convert the solar-generated electricity from direct current to alternating current. A great advantage of PV systems is that they are fully scalable and vary in size according to the local energy needs, so they can be used for residential, commercial and industrial electricity needs.
A grid-connected PV system is connected to the existing electricity grid. The electricity produced by the system can be used to feed local loads and the surplus is delivered to the electricity grid. This type of system is our main focus, as DEWA Distributed Solar Program deals with PV systems connected to DEWA electricity grid.
- Using solar energy produces no air or water pollution and no greenhouse gases emissions. Solar power offers benefits to both homeowners and businesses:
- Reduces electricity bills – installing a solar PV system requires you to undertake an initial investment, but – due to the electricity generated locally – allows you to reduce your electricity bills over lifetime of the system (25 years and beyond for a well maintained installation);
- Increases the value of your property – should you decide one day to sell or rent out your property, it will likely attract a higher price or rent in the market if a PV system is installed. In fact, the new owner or tenant will enjoy lower electricity bills due to the electricity generated locally;
- Reduces your carbon footprint – Your carbon dioxide footprint is a measure of how much carbon dioxide you’re releasing into the environment based on your energy-consuming habits. By using solar energy, you will be able to reduce or even erase your carbon footprint;
- Supports Dubai’s economy and ensure its sustainable future. Solar power is locally produced. Every kWh of solar energy that we produce in Dubai reduces our demand for electricity.
Solar energy is a form of renewable energy which is clean, secure, and limitless. It produces no emissions and does not affect the environment.
Using renewable energy reduces our reliance on diminishing traditional sources of energy, such as gas, oil and coal, ensuring sustainability for future generations.
Renewable energy is a key factor in Dubai’s efforts to foster economic, and social growth while preserving the environment.
In 2011, the Dubai Supreme Energy Council formulated the Dubai Integrated Energy Strategy 2030, which requires renewable electricity sources to contribute to 15% of Dubai power needs. The launch of Mohammed bin Rashid Al Maktoum Solar Park is the first milestone in the path to achieving this vision. The production and use of solar energy by Dubai citizens, businesses and industries will also contribute to this vision becoming a reality.
There is no single or simple answer. Capital Expenditure (also known as Capex, or investment cost) depends on a number of factors, such as whether the system is retrofitted or integrated into the building design, the size of the system, and the system components’ manufacturer, retailer, and installer.
Customers also need to take into account Operating Expenditures (Opex) for the annual maintenance of their solar systems (inspection, cleaning of panels, replacement of parts where needed), which can represent roughly 5% of the initial investment.
The cost of the solar PV system will also depend on equipment prices, which follow market conditions and evolve frequently. Currently (Q2 2021) typical system costs are in the 4,500-5,000 AED/kWp range for small ‘villa-size’ systems and in the 3,500-4,000 AED/kWp range or even below for larger ones.
DEWA’s connection fee typically represents a small share of the investment, as a one-off charge currently set at 1,500AED. This amount can also be reduced significantly for small systems (below 10kWp) if no generation check meter is required.
Interested customers can reach out to one of the Solar Contractors or Consultants enrolled with DEWA under Shams Dubai initiative in order to assess feasibility, cost and bill savings of solar PV projects.
Dubai is currently applying resolution number (46) of 2014 concerning the connections of generators of electricity from solar energy to power distribution system in the emirate of Dubai which was announced by H.H Sheikh Hamdan bin Mohammed Bin Rashid Al Maktoum, the Crown Prince of Dubai and the Chairman of the Executive Council of Dubai.
The new resolution includes a number of provisions regulating the process of consumption and export of electric power from the production unit to DEWA distribution network, where the electricity produced from the production unit is consumed in real estate associated with a single consumption account, In the case of more than one consumption account for the producer, the electricity produced will be consumed in the real estate on the same plot to which the accounts relate. If the amount of electricity produced exceeded the amount of electricity consumed the surplus will be exported to DEWA distribution network through a Net Metering scheme, this surplus energy will be credited and used to off-set future consumption of electricity. The resolution also stipulates that the producer shall not be paid any money for the excess electricity, and set-off between this surplus and the imported energy shall be limited in accordance with the provisions of the resolution and the regulations adopted by the Authority in this regard.
The incentive is therefore the savings on the electricity bill, as you will be purchasing less electricity from DEWA in order to meet your needs. The details on how the Net Metering scheme works can be consulted in the DRRG Connection Conditions document available on Shams Dubai website under ‘Publications and Resources’
No tax or other incentives are currently being offered.
The investment return and savings depend on how much electricity you currently use, and the tariff you are paying (see ‘Slab Tariff‘, and how much electricity the photovoltaic system will produce. In general it can be said that the business case for clients with larger consumption and the possibility to install bigger systems is currently more attractive than for clients with low consumption and smaller systems.
You can ask your photovoltaic system provider see (List of Enrolled Electrical & Solar PV Consultants & Contractors) how much your new system will produce on an annual basis and compare that number to your annual electricity demand to get an idea of how much you will save.
DEWA
Customer
Consultant /Contractor
Equipment Manufacturer
The connection procedure consists of 4 different stages:
- The No Objection Certificate (NOC) stage
- The Design Approval stage
- The Inspection and Connection stage
- The Generation stage
For any customer interested in investing in a Solar PV generator, it is recommended to hire a DEWA enrolled Electrical & DRRG Solar PV Consultant or Contractor (List of Enrolled Electrical & Solar PV Consultants & Contractors) who will act as the customer’s agent and will advise on the best possible solution for your system.
During the first stage, the Consultant/Contractor will gather all necessary general information and will then submit the online PV connection application form (Apply for Solar PV Connection).
DEWA will carry out the application assessment and ensure all necessary documents have been submitted and all the criteria have been met. Upon successful completion of the assessment, DEWA will issue the No Objection Certificate (NOC).
In the second stage, the Consultant/Contractor should submit the online Application for Design Approval (Apply for Solar PV Connection). With this application a number of technical documents need to be submitted to DEWA, such as the site plans, system design plans and details of the proposed equipment, compliance with DEWA regulations.
Upon successful completion of the application assessment by DEWA, and upon approval by the competent Authority/Entity (i.e Dubai Municipality, Trakhees, Etihad Esco etc.), the required construction and installation can begin.
In the third stage, once the installation works have been finalized, the Consultant/Contractor can apply online with DEWA for Notification for Electrical inspection and Testing, in order to proceed with the Connection. Along with this notification, the Consultant/Contractor will also be required to submit a number of documents, including the completion certificate from the concerned building Authority and the Shams Dubai Connection Agreement signed by the customer. Once DEWA finalises the assessment, meters will be installed.
The final stage begins once DEWA has installed the meters. The solar system will be generating electricity, and DEWA will be also considering any surplus generation fed into the grid for the purpose of offsetting against the customer’s consumption.
You will also be required to submit the signed Connection Agreement with DEWA, which sets out the net metering arrangement and the responsibilities of both parties.
In addition, you will be required to present a signed Operation and Maintenance Contract as well as the Operation and Maintenance Manual provided by your Consultant and / or Contractor. For more details please refer to (DEWA DRRG Connection Guidelines).
A PV system is made up of different components. These include:
Solar Panels
Solar panels are the electricity-generating units of a Solar PV system. Most solar panels have a life cycle of up to 25 years, but in some cases this can be longer. They are usually guaranteed by the manufacturer for a certain portion of the lifespan and they undergo a loss of performance over time. Therefore, some minimum efficiency is typically guaranteed.
Inverter
The Inverter converts the DC electricity produced by the solar panels into an alternating current (AC) that can be used directly in the house or injected into the DEWA network. The Inverter should be located in an airy, safe and accessible area and protected from direct solar radiation and water. Inverters typically have an efficiency above 95% and a general warrantee for 10 years.
Metering System
To measure the electricity generated by the renewable generation unit and electricity consumed in the premises, two energy meters are usually installed:
- The first meter* (Generation check-meter) supplied and installed by DEWA measures the power generated by the photovoltaic system.
- The second meter supplied and installed by DEWA measures the power exported to DEWA grid and the power imported from DEWA grid. During the connection process, the renewable generation unit will be inspected by DEWA before the metering system can be installed. The inspection ensures that the generation unit complies with DEWA technical and safety regulations.
* The PV Generation check-meter can be waived for certain Shams Dubai projects < 10kW:
- In the case of villa communities having a large number of villas equipped with identical or similar small scale installations, the Generation check-meter is required only for a suitable sample of villas to be agreed with DEWA;
- In the case of individual buildings, provided the local area is not already saturated with other similar installations
Interface protection
An automatic decoupling device (also called Interface Protection) should be installed between the inverter and the network connection point, if not yet incorporated in the inverter. This decoupling device stops the PV plant when a problem is detected on the network or when maintenance is needed. This prevents the current from being injected into the network or the electric loads within the premises when the electric power supply has been switched off for safety reasons.
Such specifications are included in the following documents:
- Standards for (Distributed Renewable Resources Generators connected to the Distribution Network)
- Connection guidelines for Renewable Resources Generators connected to medium- and low-voltage distribution networks.
- The manufacturer should provide a certificate proving that their equipment is compliant with these requirements. This certification document will be requested by DEWA during the connection process. A list of eligible equipment can be found on DEWA Website. The list is non exhaustive: you can opt for a manufacturer currently not included in the list as long as the following two conditions are met:
- The equipment must be compliant with DEWA standards
- Proof of such compliance must be sent to DEWA based on the same requirements formulated in the manufacturer equipment eligibility process instructions (PV Equipment Eligibility).
Solar panels have truly come a long way. As its popularity increases and installation costs are gradually reduced, a lot of homeowners and businesses nowadays are eager to benefit from this sustainable technology.
The roof orientation, shading and surface area will determine whether you can benefit from this technology as well as the type and size of equipment you require.
We advise you to contact a DEWA enrolled Electrical & DRRG Solar PV Consultant or Contractor that can evaluate your criteria and advise you on the best possible solution for your premises.
There are three factors to be considered when planning to install solar cells onto the building’s envelope:
- Panels orientation to the sun
- Panels inclination
- Potential shadow
The favourable orientation for fixed solar cells in the United Arab Emirates throughout the year is south, and the optimal inclination is about 24 degrees. This typically allows an annual irradiation of about 2100 kWh/m2 for Dubai, when both direct and diffuse radiation are considered.
It is important that panels are kept clean and any deposit of dirt and dust is avoided, since these reduce sensibly the efficiency of the panels. Dubai is in a region prone to dust storms and its accumulation, therefore it is recommended that you clean the PV frequently.
Furthermore, it is advisable to avoid any shadow on the panels because this can cause a significant drop in performance, may damage the module.
A solar system is generally made up of modular components. This means that one can easily replace a malfunctioning component, and possibly extend the system in the future.
Panels are usually installed on the roof rather than on the building façade, to reduce the visual impact and ensure ease of access for cleaning and maintenance. However, PV systems can be blended into almost any imaginable structure. You might find PV being used outdoors for security lighting as well as in parking lot rooftops and bus station shelters. Within the Shams Dubai initiative, ground-mounted panels are not envisaged.
Who will be responsible for maintaining the solar panels and related equipment once it is installed?
The maintenance of the system is the responsibility of the customer, who is required to have an operation and maintenance contract with a service provider. As part of the connection process, the customer must present a signed Operation and Maintenance Contract. It is required that the Operation and Maintenance Contract Service providers are enrolled as Electrical & DRRG Solar PV Consultant and Contractors.
The cost of the system depends on the size as well as the type of system used. Please refer to the answer to question 4 “What is the investment cost breakdown (equipment, installation, connection and maintenance fee”.
DEWA will charge a one-off connection fee as part of the connection process. No further specific charges will be added to future customer’s bills on an ongoing bases. For most installations, the one-off connection fee will simply equal the fixed amount charged by DEWA for each renewable generator connected to the grid. This amount is currently set at AED 1,500 for each renewable generator, and covers mainly the cost incurred by DEWA for the procurement and installation of the Solar PV generation check meter. This one-off connection fee can be reduced if no Generation check-meter is required.
- The PV Generation check-meter can be waived for certain Shams Dubai projects < 10kW:
- In the case of villa communities having a large number of villas equipped with identical or similar small scale installations, the Generation check-meter is required only for a suitable sample of villas to be agreed with DEWA;
- In the case of individual buildings, provided the local area is not already saturated with other similar installations
For large installations (with size above 400 kW) some dedicated equipment might be needed for the proper integration of the renewable generator into DEWA distribution network. In this case, DEWA will charge the cost of such equipment as part of the connection fees. The need for such equipment, will be made known to the applicant in the early stages of the application process, so that the customer will be in a position to take an informed decision on whether to proceed with the project or not. An estimate of the connection fees will then be communicated to the customer in design approval stage.
The bi-directional smart meter measuring the electricity exported to and imported from DEWA electricity grid will be installed by DEWA without any additional cost to customers over the normal service charges.
The Generation check-meter, if installed to measure the electricity generated by the PV system, is charged by DEWA as part of the one-off connection fees*.
* The PV Generation check-meter can be waived for certain Shams Dubai projects < 10kW:
- In the case of villa communities having a large number of villas equipped with identical or similar small scale installations, the Generation check-meter is required only for a suitable sample of villas to be agreed with DEWA;
- In the case of individual buildings, provided the local area is not already saturated with other similar installations